BSL – 3 LABORATORY PHASE I

JS Biosciences, Inc.
Lanzhou, China

Client Information

JS Biosciences

High Tech Incubator, 24th Floor
A Ning District
Lanzhou, China 730030
Dr. Shun Luo
Chief Executive Officer

+86-931-760-6666
luoshun@jianshunbio.com

Project Budget

$76.8 Million

Building Size

70,000 SF

As part of a larger facility that includes a cell culture manufacturing facility and related pilot lab, the BSL-3 virology facility has (8) twin lab suites per laboratory that included casework, incubators, biological safety cabinets, and a bioreactor test lab. The facility provides researchers with state-of-the-art laboratories in which to safely study biosafety level III pathogens, agents, toxins and select and non-select agents regulated by the Centers for Disease Control, cGLP Guidelines, China Biosafety, Guide (CBG), and World Health Organization Laboratory Biosafety Manual (3rd Edition 2004). The new facility allows up to approximately 55 researchers to work simultaneously in the 3 laboratories. Together, the labs contain:
• 11 class II biological safety cabinets
• 2 class III biological safety cabinets
• 2L, 5L, and 10L bioreactors
• Air interlocks
• 2 pass through autoclaves
• 4 showers
• Centrifuges, incubators, freezers, -80° C and -20° C freezers, etc.
Services Provided:
• Project Delivery Team Member Selection, Contract Development and Negotiations
• Master Budget and Schedule Development and Control
• Project Management Consulting Services
• Monitoring and Analyzing the Construction Effort Continually
• Construction Coordination

Architect

CRB Consulting Engineers
Keith Kettler
Principal

(816) 891-3672

Engineer

CRB Consulting Engineers
1251 N.W. Briarcliff Parkway, Suite 500
Kansas City, MO 64116

(816) 891-3672

Final Results

Accomplishments

Completed 2 months ahead of schedule and $1.5M under budget

This project was one of several that TCM completed in China which required very stringent adherence to international health and biological standards.